Areas referenced below can be located on this map
Work completed 3/17 through 3/23:
- 3 to 4 crews on-site
- Bored 1,682 feet on Werkner Road (Werkner PON)
- Bored 952 feet on Werkner Road (Island Lake PON)
- Provided Eastern Massassagua Rattlesnake (EMR) training to existing and incoming crews. Training including identifying, completing a construction walk-down, and reporting an encounter with the EMR.
- H&M met with Washtenaw County Road Commission (WCRC) for work stoppage during seasonal weight restrictions (aka “frost laws”) on WCRC roads
- Mailed out 3rd MEC marketing postcard
- 644 total sign-ups
Work to be completed 3/24 through 3/30:
- 2 crews on-site
- Continue boring on Werkner Road (minimal effort during seasonal weight restrictions on WCRC roads)
- Work on road crossings and tying in lines for completed borings
- Attend in-person Broadband Implementation Committee meeting on March 26
- Lyndon Township residents attend first MEC Open House / Learning Education Series (Drop Installation) on March 27