Construction Update 12-8 to 12-21

Areas referenced below can be located on this map
Work completed 12/8 through 12/14:
  • 6 bore crews on-site plus one fiber pulling crew and one splicing crew
  • Bored 1,225 feet on Waterloo Road (Sugarloaf PON)
  • Bored 430 feet on Maple Road (Sugarloaf PON)
  • Bored 608 feet on Stofer Road (Wild Goose PON)
  • Bored 1,114 feet on Hadley Road (Wild Goose PON)
  • Bored 297 feet on First Street (Wild Goose PON)
  • Bored 45 feet on Wild Goose Lake Road (Wild Goose PON)
  • Bored 740 feet on Hadley Road (Bruin PON)
  • Bored 1,078 feet on Crescent Drive (Bruin PON)
  • Installed 1 pedestal in Wild Goose PON
  • Spliced fiber in Central Office and Boyce PONs
  • 41 new drops this week (totals to-date: 305 total drops – 84 in Werkner PON, 66 in Island Lake PON, 77 in Central Office PON and 78 in Boyce PON)
  • Spliced 9 jobs (totals to-date: 148 spliced – 84 in Werkner PON, 63 in Island Lake PON and 1 in Central Office PON)
  • 15 new home installations (totals to date: 123 with broadband – 75 in Werkner PON, 47 in Island Lake PON, and 1 in Central Office PON (Township Hall))
Work to be completed 12/15 through 12/21:
  • 6 bore crews on-site plus one fiber pull crew and one splicing crew
  • Bore on Maple Road (Sugarloaf PON)
  • Bore on Waterloo Road (Sugarloaf PON)
  • Bore on Sugarloaf Lake Road (Sugarloaf PON)
  • Bore on Stofer Road (Wild Goose PON)
  • Bore on Hidden Lake Road (Wild Goose PON)
  • Bore on Watt Road (Wild Goose PON)
  • Bore on Crescent Drive (Bruin PON)
  • Bore on Hadley Road (Bruin PON)
  • Release Central Office PON to MEC for splicing and home installations
  • Continue to pull fiber in Sugarloaf and Long Lake PONs and splice fiber in Central Office and Boyce PONs
  • Continue home installations in Werkner and Island Lake PONs
There are four basic phases of work in bringing internet service to your home:
  • Mainline Boring
  • Mainline Fiber Installation
  • Drop Installation (bringing fiber cable from the road to the side of each home)
  • Home Installation (bringing fiber into you home and attaching to network router)

Here is the current status for zones or PONS that are in progress.

Werkner
Mainline Boring complete
Mainline Fiber Installation complete
Drop Installations 96% (84) complete
Home Installations 85% (75) complete
88 (up from 84) Subscribers

Island Lake
Mainline Boring complete
Mainline Fiber Installation complete
Drop Installations 94% (66) complete
Home Installations 67% (47) complete
70 (up from 68) Subscribers

Central Office
Mainline Boring complete
Mainline Fiber Installation 99% complete
Drop Installations 88% (77) complete
Home Installations 1% (1) complete
88 (up from 79) Subscribers

Boyce
Mainline Boring complete
Mainline Fiber Installation 99% complete
Drop Installations 63% (78) complete
123 Subscribers

Sugarloaf
Mainline Boring 93% complete
Mainline Fiber Installation 35% complete
114 Subscribers

Guinan
Mainline Boring 68% complete
40 Subscribers  

Long Lake
Mainline Boring 96% complete
Mainline Fiber Installation 64% complete
80 Subscribers

Wild Goose
Mainline Boring 74% complete
Mainline Fiber Installation 24% complete
45 Subscribers

Bruin
Mainline Boring 17% complete
52 Subscribers

Posted in Uncategorized, Updates.